Agence spatiale canadienne
Symbol of the Government of Canada

Table of Contents

Phase 1 - Liftoff

Request for Data

Teacher Notes

  1. This activity should be completed individually.

  2. The approximate time for completion is 15 – 20 minutes.

  3. Students should have access to protractors.

  4. Answers:

    • Launch #1
      m < A = 55°
      m < B = 90°
      m < C = 35°

    • Launch #2
      m < A = 70°
      m < B = 90°
      m < C = 20°

For Launch #1, the sum of the measures of the angles is 55° + 90° + 35° or 180°.

For Launch #2, the sum of the measures of the angles is 70° + 90° + 20° or 180°.

Request for Data

Name: __________________ Date: _________________

Each of these launches was successful. The Flight Director at Mission Control has asked that you provide data to confirm the success of the launches.

These diagrams show the position of the shuttle shortly after launch.

Position of the shuttle shortly after launch

  1. Measure and record the interior angles of the triangles formed
    shortly after launch.
  2. Describe how you can check the accuracy of your calculations.